Doosan Škoda Power will deliver a turbo set to Hussein Thermal Power Station in Jordan. The Plzeň-based turbine manufacturer has designed its own turbine set with the output of 183 MW for the planned expansion of the power plant by totally ca. 485 MW. Chinese SEPCOIII is the EPC supplier and direct client of Doosan Škoda Power for the project
Source: www.cianews.cz